New office space
Our new office space in De Kauwgomballenfabriek is taking shape. The former Maple Leaf factory and later artist studios are currently transformed into a light and open office space. We’re expecting moving in by July.
New project: Fluor
We have been commissioned by Dura Vermeer to join the design team for the infill of the new urban plan for Haarlem Schalkwijk Midden. The ambition is to create a ‘city between the trees’ that offers a quiet, green and low traffic residential environment. Our commission includes 42 apartments, 9 single family houses and 4 duplex lofts.
Update: KBF-atrium
Next to the factory of the steel production company Evers Staalbouw the construction of the KBF-atrium has been mounted to test the geometry. With a few hard hammer blows everything fit together and will be made ready for assembly on-site.
Share office space?!
We’re moving into a new ad very spacious office in De Kauwgomballenfabriek in Amsterdam Overamstel. Interested in sharing space with us? Drop us a line: info@meesvisser.com
Study: Christelijk Lyceum Veenendaal
Commissioned by Stichting Mevrouw Meijer we conducted a study into several scenarios for the renovation and expansion of a typical sixties school building in Veenendaal (project page). Parallel to the research project we joined forces with de Architecten CIE to enter the European tender for the commission of the project.
Study: waterwonen
In collaboration with DELVA landscape, we conducted a spatial study into the possibilities of a modular urban principle for living on water, informed by organisational systems of informal water-bound villages in Lagos, historical water cities Venice and Amsterdam, but also the aesthetical quality of floating icebergs and waterlilies. (project page)
Update: BSH plot 4a
We have finished the first phase of the design of Buiksloterham kavel 4a for Ymere. This phase mainly focussed on finding the right mix of programme and studying various options for the layout of the compact apartments. This involves the design of smart and compact built-in furniture for optimal use of the minimal available space.
Update: KBF atrium
The building permit for the KBF-atrium has been submitted. We are currently focussing on working out the complex geometry of the steel construction in a BIM-model. The steel will be prefabricated, followed by a trial-assembly in the factory to make before construction on site.
Study: windmills 21st. century
A research into a new type of windmill: contemporary, self-sufficient and an addition to the landscape. (project page)
Update: Boerejongens.
The building application for the renovation of the former office building along the Basisweg (Boerejongens) has been approved by the municipality. Construction will start soon.